Availability : Usually Ships in 25 Business Days
This version of PJN3-0008 tank is supplied with a dump valve for dumping the waste into an approved receptacle. The dump valve parts should be assembled after the unit has been assembled. Note: After assembly, the unit must be elevated by 3? minimum to obtain the proper clearance for the dump valve assembly. This may be done by placing two- 2 x 4 (or 2 x 6) boards underneath each runner.
Does not work with PolyJohn Fleet Series Restrooms, or larger models - PJ series only.